Update the circulation without making the new metalwork feel disconnected
Renovation work begins with constraints that new construction may not have. Floor openings, stair geometry, wall locations, framing and finished surfaces can already be established before new metalwork is introduced.
For this Tacoma project, the stair and railing package needed to improve the visual flow of the space while responding to those existing conditions. The strongest direction came from treating measurement, detailing, finish and installation sequencing as connected parts of the renovation.
Project priorities
- Architectural role: give the renovated circulation area a clearer and more intentional identity
- Coordination scope: existing stair conditions, railing transitions, attachments and adjacent finishes
- Visual objective: replace dated elements with cleaner lines and a cohesive metalwork language
- Planning objective: develop a retrofit approach that reflects verified site conditions